SAM.gov Active UEI HCJHBU568NV1 CAGE 18SX6 Primary NAICS 561720
Consolidated Facilities Group
Federal facility services
Capability · NAICS 238160 · 238170

Federal commercial roofing & envelope, warranty-grade.

Re-roof, recover, and repair for federal envelopes across the Rocky Mountain region. Delivered by McIntire Roofing — 25 years of commercial and federal roofing past performance, manufacturer-certified, warranty-eligible. CFG holds the prime. McIntire holds the trowel.

238160 · Roofing Contractors 238170 · Siding Contractors
01

Warranty-eligible installs

Manufacturer-certified crews for TPO, EPDM, PVC, modified bitumen, and standing-seam metal. Full manufacturer warranty packages available — NDL and system warranties documented per award.

02

Davis-Bacon compliant

Construction-trade wage determinations verified per solicitation. Certified-payroll-ready crews. Fringe and H&W loaded into pricing stack. No surprise wage exposure.

03

25 years of past performance

McIntire Roofing's federal and commercial past-performance record is the delivery engine. References available on request. CPARS-comparable performance history.

04

Rocky Mountain ready

Snow-load engineering. Wind-uplift design for Front Range exposures. Manufacturer spec tuned to Colorado elevation and UV load. Crews native to mountain-front jobsites.

Roofing systems

What CFG delivers on a federal envelope.

Every system below is installed by manufacturer-certified crews and delivered under warranty-eligible terms. Full tear-off, recover, and repair scopes supported.

TPO — thermoplastic polyolefin

Mechanically-attached, fully-adhered, and induction-welded TPO membrane. GAF, Carlisle, Firestone, Johns Manville, and Versico systems. NDL warranty programs available.

PVC — polyvinyl chloride

Fully-adhered and mechanically-attached PVC systems. Chemical-resistant and high-reflectivity options. Preferred for federal kitchen, exhaust, and rooftop equipment exposure.

EPDM — ethylene propylene diene

Ballasted, mechanically-attached, and fully-adhered EPDM. Black and white membrane options. Long-track performance for Front Range temperature swing.

Modified bitumen

Two-ply and three-ply SBS and APP modified-bitumen systems. Torch-applied, cold-applied, and self-adhered options. Ideal for re-cover over aging BUR assemblies.

Standing-seam metal

Snap-lock and mechanically-seamed metal roofing in Kynar 500, Galvalume, and copper. Snow-retention engineering. Structural decking repair as needed. On-site roll-forming for long panel runs.

Exposed-fastener & R-panel

R-panel and PBR panel replacement for industrial, warehouse, and base-support structures. Ideal for budget-sensitive federal outbuildings and utility structures.

Repair, coatings & maintenance

Roof condition surveys. Infrared moisture scans. Silicone and acrylic re-coating programs extending roof life 10–15 years. Annual preventive-maintenance CLINs for federal portfolios.

Building envelope & siding (238170)

Exterior wall cladding — fiber-cement, metal panel, insulated-metal-panel, and architectural metal siding. Coordinated envelope re-sealing during re-roof. Flashing and transition details to manufacturer spec.

Gutters, downspouts & drainage

Seamless-gutter replacement. Snow-belt leader systems. Internal drains and overflow scuppers. Site drainage tie-ins. Integration with low-slope and metal-roof scopes.

Leak response & storm mobilization

24/7 leak-response coordination through CFG. Rapid-mobilization windows for multi-building storm and hail damage. Temporary weather-tight stabilization before permanent repair.

Roof-top equipment coordination

HVAC unit curbs, pipe penetrations, ductwork flashings, solar-array attachment. Coordinated with plumbing/HVAC scope where CFG is prime for multi-trade work.

Federal re-roof planning

Phased re-roof scheduling for occupied federal buildings. Hot-work permit coordination with facility. Temporary weather protection during phased install. Daily dry-in discipline.

Compliance posture

Davis-Bacon ready. Manufacturer-certified.

Federal roofing awards turn on wage compliance, manufacturer credentials, and site-safety plans. Every scope below maps to published federal standards.

Wage

Davis-Bacon Act

Construction-trade wage determinations applied to all roofing and envelope scopes. Certified payroll submitted weekly. Prevailing-wage fringe loaded into pricing stack.

Safety

OSHA 30 & fall protection

OSHA 30 site-supervisor certification on every crew. Written fall-protection plans for each roof. Warning-line, guardrail, and PFAS systems per scope. Daily safety huddle documented.

Quality

Manufacturer-certified install

GAF Certified, Firestone Red Shield, Carlisle Hardcast, Johns Manville Peak Advantage. Warranty-eligible install at award. Manufacturer warranty inspection on completion.

Insurance

General liability & umbrella

General liability with federal-facility additional-insured endorsement. Excess/umbrella coverage to meet or exceed federal solicitation floor. Workers' compensation current.

Warranty

NDL & system warranties

No-Dollar-Limit and system warranties per manufacturer program. 15, 20, and 30-year options. Documented maintenance schedule to keep warranty active.

Environmental

Storm-water & waste

Construction storm-water BMPs per NPDES. Tear-off waste diverted to recycling where feasible. SDS library current for adhesives and coatings.

Buyer fit

Built for these roofing solicitations.

Federal envelope opportunities CFG is positioned to compete for across the Colorado Front Range.

Base-wide re-roof IDIQs

DoD base re-roof IDIQ task orders at Fort Carson, Peterson SFB, Buckley SFB, Schriever SFB. Multi-building portfolios. Phased delivery. Occupied-building re-roof discipline.

GSA PBS envelope renewal

Denver Federal Center building envelope renewals. Multi-trade coordination (roof + envelope + remediation where water intrusion has occurred). Single prime accountability.

VA facility re-roof

VA Eastern Colorado Health Care System building envelope and re-roof. Coordinated with facility operations to minimize disruption to clinical spaces.

BOP facility roofing

Federal Bureau of Prisons re-roof and envelope work at Florence FCI and Englewood FCI. Secure-facility access protocols. Direct lines into BOP procurement.

Storm / hail response BPAs

Blanket Purchase Agreements and IDIQ vehicles for rapid-response storm and hail work. Multi-building damage assessment. Xactimate scope documentation.

Small-business & 8(a) set-asides

Priced for set-aside competition. 8(a) application in process. Teaming arrangement with McIntire Roofing documented and available for review.

From the founder
Federal roofing is won by the contractor who can walk through a pre-proposal site visit, quote warranty terms by name, and put a Davis-Bacon certified-payroll packet on the desk. McIntire Roofing does all three. CFG primes the contract.
MG
Matt Gustafson
Founder & Principal · Consolidated Facilities Group
Ready to mobilize

Put CFG on the roofing bidders list.

Tell us the facility, the system, and the period of performance. We return a warranty-mapped capability brief within one business day.